Skip to main content

Ho to verify the UL power requirements for the SC820

Backup Power for the SC820:

  1. An AC generator capable of 40 Ah for 4 hours
  2. If no AC, then DC capable of 240 Ah for 24 hours

 


JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.