NFPA 72 – 2013 introduced changes from the previous code requirements for supervising phone lines.
-
The requirement for phone supervision time increases from 5 minutes to 60 minutes.
-
The requirement for annunciating the failure of either phone line is changed to 6 hours.
Proper phone line supervision is accomplished with 4 schedules with one every 6 hours each day. This provides annunciation at the monitoring station within 6 hours of a failure on either phone line.
The below example describes using 4 schedules, 6 hours apart at 01:00, 07:00, 13:00 and 20:00.
-
In Panel Wide Parameters > Phone and Phone Parameters, set Two Phone Lines =YES. Figure 1: Set Two Phone Lines=YES
-
Create 4 skeds 6 hours apart (see figure 2), each configured with Function= Send Test Report. Select the following options In the Function area of each Sked (see figure 3).
-
Parameter1: Deferred=NO.
-
Parameter2: Frequency=Scheduled.
-
Parameter3= Custom.
-
Parameter4= RG 1, Primary and RG 1, Backup 1 both selected.
-
Figure 2 Skeds 1 - 4 -
Figure 2: Skeds 1 - 4
-
-
Figure 3: Sked function settings for Skeds 1 – 4
-
NFPA 72 – 2010
-
26.6.3.1.4.1 Single Communications Technology.
-
Where only one communications technology is used, any failure of the communications path shall be annunciated at the supervising station within 5 minutes of the failure.
-
-
26.6.3.1.4.2 Multiple Communications Technologies.
-
Where two or more different technologies are used, the following requirements shall be met:
-
Provision shall be made to monitor the integrity of each communications path.
-
Failure of any communications path shall be annunciated at the supervising station and at the protected premises within not more than 24 hours of the failure.
-
Exception: Where technologies used are described elsewhere in this Code, monitoring for integrity shall be permitted to comply with those requirements.
-
NFPA 72 – 2013
-
26.6.3.1.5 Single Communications Path.
-
Unless prohibited by the enforcing authority, governing laws, codes, or standards, a single transmission path shall be permitted, and the path shall be supervised at an interval of not more than 60 minutes. A failure of the path shall be annunciated at the supervising station within not more than 60 minutes. The failure to complete a signal transmission shall be annunciated at the protected premises in accordance with Section 10.15.
-
-
26.6.3.1.6 Multiple Communications Paths.
-
If multiple transmission paths are used, the following requirements shall be met:
-
Each path shall be supervised within not more than 6 hours.
-
The failure of any path of a multipath system shall be annunciated at the supervising station within not more than 6 hours.
-
The failure to complete a signal transmission shall be annunciated at the protected premises in accordance with Section 10.15.
-
-
26.6.3.1.7* Single Technology.
-
A single technology shall be permitted to be used to create the multiple paths provided the requirements of 26.6.3.1.6 (1) through 26.6.3.1.6(3).
-